12/10/07 Footings poured, with an appropriate truck! |
|
1/12/08 Walls are up. |
 |
1/20/08 Conventional roofs are on. |
|
1/27/08 Timbers up over main area. |
|
2/2/08 Porches added, north and south sides. |
View of new camp office (left) and health office (right). |
2/10/08 Interior cedar planking added in main area. |
Looking northwest: stage area (sunshine, left wall), kitchen (right wall). |
2/23/08 Insulation on and ends roofed. Joists over main hall. |
Looking northeast: blankets over thaw pipes. |
3/01/08 Cupola, anyone? |
Pre-stained redwood siding inspected by Pre-Camp crew. |
3/09/08 Ready for roofing. |
Ready for pouring the main floor. |
3/16/08 Ready for roofing, again. |
The main floor is in, and construction continues. |
3/24/08 Lots of exterior progress. |
Close up of the north wall siding and standing seam roof. |
3/29/08 Polar Cub Day Camp, not too much snow. |
Close up of the north wall siding and standing seam roof. |
4/05/08 Siding and roof are done. Interior work continues. |
North entry and turnaround. |
4/19/08 Exterior ready for grading. |
Stained floor in rest room. |
5/04/08 Getting close! |
New crest on Cupola. |
5/10/08 Interior nearly complete; exterior graded. |
Look, ma. No wires. Riverland Energy has buried all the
overhead wires in south camp! |
Footings for 3 new flagpoles are in (circle). |
South porch, with new barbecue pit in progress. |